← Carrollton, GA Hub Carrollton, GA • Verified Exhibit Capacity, Labor & Hall Tariff Audit CityScore™ 9.0 / 10

Carrollton, GA Convention & Event Facility Audit: UWG Coliseum

Audit UWG Coliseum side-by-side: net exhibit sq. ft., breakout rooms, labor rules ($118–$177/hr GSC Floor Rate (vs. $31.40/hr BLS Wage • 3.8× Markup • Right-to-Work State (Exhibitor-Friendly Self-Install))), $315–$420 / 20A Floor Drop 20A power drops, and room block waivers.

Free Carrollton Campuses Compared Kit
Email Me the Carrollton Campuses Compared Sheet & Local Cost Benchmarks
1 update/month • Zero broker calls

UWG Coliseum: Verified Carrollton, GA Facility & Space Audit

Verified exhibit square footage, breakout rooms, labor rules, walkable hotel rooms, and 10×10 all-in booth benchmarks for UWG Coliseum in Carrollton, GA.

Carrollton Campus Exhibit & Gross Sq. Ft. Ballrooms & Breakout Rooms Labor Regime Walkable Rooms Hall License / F&B Rule 10×10 All-In Action
Heavy Equipment, Ag & Multi-Pavilion Expo Park • 4,000–60,000+ Heavy Machinery, Agricultural, Livestock & Automotive Expos
40,000 sq. ft.
Max Hall: 20,000 sq. ft.
11,200 sq. ft. (4 configurable breakout rooms) Right-to-Work State • Ground-Level Drive-In & Mobile Crane Spotting (4 freight dock bays + drive-in roll-up portal) 1,580+ Park Corridor Rooms (Courtyard by Marriott Carrollton) $0.22–$0.35/net sf Indoor Pavilion + $0.12/sf Outdoor Hardstand ~$7,100 (10×10 Ground-Load Inline Est.) Venue Hub →
Methodology & Tariff Provenance: Municipal convention centers price raw exhibit halls per net sq. ft. (eligible for 50%–100% Visit Carrollton CVB subvention rebates when master hotel room-night thresholds are met), wholesale marts license temporary expo halls alongside permanent showrooms, and HQ convention resorts waive ballroom rental ($0 space license) against a contracted 80%+ group room-block pickup and banquet F&B minimum. Modeled 10×10 exhibit figures (Est.) reflect property-calibrated planning benchmarks combining 100 sq. ft. space, facility drayage, local union or in-house setup labor, and 1× 20A/120V power drop; request written property proposals for binding event-date quotes.